Rosemary Square and the Rosemary Street deck, 1985–1994

How Chapel Hill tried to turn its Rosemary Street parking lot into Rosemary Square between 1985 and 1989: the contract with the Fraser Company, the approvals and Jim Wallace’s opposition, the residents’ suit settled by the N.C. Supreme Court, five extensions, the unsold condominium-hotel units and the developers’ withdrawal in April 1989.

In January 1985 Chapel Hill contracted with the Fraser Company to replace its Rosemary Street parking lot with a hotel, shops and a shared parking deck. Former mayor Jim Wallace opposed it and won the mayor's race, residents sued, and the N.C. Supreme Court upheld the deal in 1987. After five extensions and slow sales of condominium-hotel units, the developers gave up in April 1989, and the town began planning its own garage. In August 1990 the council approved $5.2 million for a 315-space deck and plaza at Rosemary and Henderson streets, and work on the $7.3 million deck was under way by October 1991. The deck opened in September 1993, and in 1994 the town refinanced it through a new town corporation.

Read the full storyRead the 34 eventsAll storylines

Read the events and sources below.

No works in the index are currently linked directly to this storyline. The works below are about the places and people this story names.

The full story

In June 1984 the Chapel Hill Town Council opened talks with the Fraser Company of Research Triangle Park on developing the municipal parking lot between Henderson Street and NCNB Plaza. On January 30, 1985 it unanimously approved a contract for the $19 million Rosemary Square project: a 120-suite hotel, a public plaza, a renovated alley, a parking deck of 325 public and 175 private spaces and 22,400 square feet of shops and offices. The town agreed to issue up to $3.5 million in bonds, and a motion by Nancy Preston and David Pasquini to wait a month for another hearing failed 6 to 2. By April the town had paid $1.4 million for the Pearsall property, where Hunam Chinese Restaurant had leased its building, for parking while the project was built.

On October 1, 1985 the Planning Board voted 8 to 0 to recommend a zoning compliance permit for the hotel, shops and 500-space deck that the town and the Fraser-Morrow Company planned behind the post office at Rosemary and Henderson streets. The Historic District Commission approved the plans on condition that building begin July 6, and on October 14 the council gave the site plans final approval, with Pasquini voting no. On October 30 former mayor Jim Wallace, a candidate for mayor who owned an adjacent Franklin Street building, appealed to the Board of Adjustment, arguing that the hotel's suites could be rented as 238 rooms without the parking the zoning ordinance required. On November 5 Wallace beat council member Beverly Kawalec, who supported the project, in a race he said had become a quasi-referendum on Rosemary Square. A week later the council restricted traffic on the alleys connecting Franklin Street with the site.

On January 13, 1986 the council voted 5 to 4 against a new public hearing, with Mayor Wallace in the minority, and let Town Manager David Taylor negotiate the developer's proposed changes. Wallace questioned whether spaces the town provided in the shared parking would be an illegal subsidy. On April 14 the council approved the amendments 5 to 4, cutting the lodging units to 188, bringing the parking to 516 spaces and setting construction to run from December 31, 1986 to June 30, 1989.

On August 27, 1986 sixteen residents sued the developer, Fraser-Morrow Daniels Co., Mayor Wallace and the council, claiming that the town's part ownership of the parking amounted to public money subsidizing a private enterprise and that the 1984 act of the legislature that allowed the project was invalid spot zoning. In September the council moved the closing deadline to June 30, 1987, or six months after a final decision, after the company wrote that the suit made it hard to finance the project. Orange County Superior Court Judge Thomas Lee ruled for the town and the developer on November 21, and the residents appealed. At the town's and the developer's request the N.C. Supreme Court took the appeal directly, and on September 3, 1987 it found no unconstitutional joint venture in the town's agreement to pay for 125 of the 516 parking spaces.

Opponents then gathered about 900 signatures in five days asking that the council's October 1 work session with the developers be made a public hearing. At the hearing 17 of the 27 speakers favored the project, now put at $33 million, and on October 12 the council informally agreed to let Fraser-Morrow-Daniels Co. go ahead and close the deal in March 1988, with Julie Andresen and Pasquini still opposed.

In January 1988 the developers asked for more time, citing their financing and a lawsuit by opponents. On January 11 the council voted 5 to 4 to negotiate a date, and Wallace said the town had extended the project three times already. On January 26 it voted 6 to 3 to move the closing to November 30, the fourth extension, so that the company could sell 170 of its 188 units before seeking a $30 million construction loan. On September 12 it voted 5 to 4 for a fifth and final extension, to September 30, 1989, with a clause ending the town's obligations if that date was missed. At the same meeting it let the Algernon Blair Group of Montgomery, Alabama, and Aircoa Equity Interest of Denver join the project with 80 percent of the equity; Mayor Jonathan Howes said the original partners lacked the capital.

The 188 units of the Chapel Hill Inn, a condominium hotel planned for the site, went on sale in January 1989 at $144,000 to $259,000, but by late March the Rosemary Group had told the Securities and Exchange Commission that it had suspended sales because they were slow; council member Joe Herzenberg said the parking agreement now faced an economic test. On April 24 a representative of the Rosemary Group told the council that the complex could not be built as a hotel or as condominiums before the September 30 deadline. Merchants pressed for a downtown parking deck, and on October 3 a town subcommittee chose the firms Michael Hining AIA of Chapel Hill and Wilbur Smith Associates of Raleigh to help plan a garage with a public plaza on top at Rosemary and Henderson streets, with 325 to 350 spaces and a cost that could reach $3 million. On August 27, 1990 the council approved spending $5.2 million on a downtown parking deck and plaza, a two-and-a-half-story deck of 315 spaces planned near the southwest corner of Rosemary and Henderson streets. By October 1991 work was under way on the deck behind the Franklin Street businesses, a $7.3 million project paid for mainly with parking revenue bonds and expected to take 15 to 18 months, with two parking levels and a public recreation level on top with a small amphitheater. Prime South Inc. was the general contractor, and town engineer George Small called it the most significant downtown project in many years. The deck opened on September 24, 1993 with 315 spaces on two and a half levels and a landscaped rooftop plaza, and on May 23, 1994 the council voted unanimously to sell it to a new Chapel Hill Facilities Corporation and buy it back in low-interest installments over 30 years, a refinancing expected to save $2 million.

In the chronology

Events in this storyline, in date order. See these 34 dated events in the chronology →

  1. Chapel Hill opens talks with the Fraser Company to develop the municipal lot off Henderson Street The Chapel Hill Town Council authorized negotiations with the Fraser Company of Research Triangle Park for joint development of the municipal parking lot between Henderson Street and NCNB Plaza. By late August the council had approved the Rosemary Square plan, giving the company 325 parking spaces with a hotel and office and retail space to be built in one to two years. Place: Municipal parking lot, Henderson Street and Rosemary Street, Chapel Hill · Also mentions: Henderson StreetSearch the index · The Daily Tar Heel, June 14, 1984, p. 1
  2. Chapel Hill Town Council appropriates $10,000 for Rosemary Square consultants The Town Council appropriated $10,000 from the Parking Facilities Fund for legal and financial advice on the Rosemary Square negotiations; the money was not spent and went back to the fund balance at the June 30 end of the fiscal year. Place: Chapel HillSearch the index · The Daily Tar Heel, September 12, 1984, p. 3
  3. The Fraser Company shows downtown merchants its Rosemary Square plans Fraser Company of North Carolina president Whit Morrow showed about 20 members of the Downtown Chapel Hill Association at Purdy's a plan for Rosemary Square with a 500-space parking deck, shops and individually sold hotel units in brick and slate, and a fund to improve the alleys behind Franklin Street, saying a contract with the town would be drawn up in two to three weeks. Place: Purdy's, Franklin Street, Chapel Hill · Also named: Whit Morrow · Also mentions: Franklin StreetSearch the index · The Daily Tar Heel, September 26, 1984, p. 1
  4. Chapel Hill Town Council extends its talks with the Fraser Company on Rosemary Square At the town manager's request the Town Council extended its negotiating period with the Fraser Company of North Carolina on Rosemary Square, the $16 million mixed-use project for Municipal Lot No. 1 on Rosemary Street between the post office and NCNB Plaza, with condominium hotel suites, a 300-car public deck, a 200-car private deck, shops and a plaza. It also approved more money for legal and financial consultants, which Town Manager David Taylor put at up to $40,000. At the same meeting council member Bill Thorpe pressed for affirmative action, noting that the police department had one Black lieutenant and the fire department one Black captain while all 22 town trash collectors were Black. People: Bill Thorpe Place: Municipal Lot No. 1, East Rosemary Street, Chapel Hill · Also named: David Taylor · Also mentions: Rosemary StreetSearch the index · The Daily Tar Heel, September 12, 1984, p. 3
  5. The Town Council approves the Rosemary Square contract The Chapel Hill Town Council unanimously approved a contract with the Fraser Company for the $19 million Rosemary Square project, which was to replace the municipal parking lot on West Rosemary Street between the post office and NCNB Plaza with a 120-suite hotel, a public plaza, a renovated alley, a parking deck of 325 public and 175 private spaces and 22,400 square feet of shops and offices. The town agreed to issue up to $3.5 million in bonds and the developer to give the town benefits worth $925,000; a motion by Nancy Preston and David Pasquini to wait a month for another hearing failed 6 to 2. People: R. D. Smith, Jonathan Howes Place: Municipal parking lot, West Rosemary Street, Chapel Hill · Also named: Nancy Preston, David Pasquini · Also mentions: West Rosemary StreetSearch the index · The Daily Tar Heel, February 1, 1985, p. 1
  6. Town of Chapel Hill buys the Hunam restaurant site on East Franklin Street for parking The town paid $1.4 million for the East Franklin Street property where Hunam Chinese Restaurant had leased its building, to use as temporary parking while the Rosemary Square project was built and parking on Rosemary Street was disrupted. The restaurant prepared to move to 790 Airport Road after April. Place: East Franklin Street, Chapel Hill · Also mentions: Airport Road, Rosemary StreetSearch the index · The Daily Tar Heel, April 15, 1985, p. 5
  7. Chapel Hill buys the Pearsall property on Rosemary Street for a parking lot The town bought the Pearsall property on Rosemary Street, the former site of the Hunam Chinese Restaurant and a car inspection business, for $1.4 million and contracted to build a parking lot there to replace spaces lost while Rosemary Square's shops, inn and parking deck went up on the municipal lot between NCNB Plaza and Henderson Street. Chapel Hill Newspaper editor Orville B. Campbell proposed building Rosemary Square on the Pearsall site instead. Place: Rosemary Street, Chapel Hill · Also named: Orville B. Campbell · Also mentions: Henderson StreetSearch the index · The Daily Tar Heel, August 29, 1985, p. 1
  8. Chapel Hill Planning Board finds Rosemary Square in compliance and backs its zoning permit After almost three hours of hearings before a crowd of about 100, the Chapel Hill Planning Board voted 8-0 to recommend a zoning compliance permit for Rosemary Square, a $19 million hotel, shop and 500-space parking deck planned by the town and the Fraser-Morrow Company behind the post office at Rosemary and Henderson streets. The board attached conditions on traffic signals and turn lanes and required the Historic District Commission to approve a landscape plan. Place: Municipal Building, Airport Road, Chapel Hill · Also mentions: Rosemary and Henderson streetsSearch the index · The Daily Tar Heel, October 3, 1985, p. 2
  9. Chapel Hill Town Council gives Rosemary Square's site plans final approval The Chapel Hill Town Council approved the Rosemary Square site plans for the last time, with Councilman David Pasquini voting no and predicting the plans would change under the council to be seated in January. The Historic District Commission had approved the plans on October 10 on condition that building begin July 6. Place: Rosemary and Henderson streets, Chapel Hill · Also named: David Pasquini · Also mentions: Rosemary Square siteSearch the index · The Daily Tar Heel, October 16, 1985, p. 2
  10. Former mayor Jim Wallace appeals Rosemary Square to the Board of Adjustment Mayoral candidate Jim Wallace, a former mayor, appealed to the Chapel Hill Board of Adjustment to stop Rosemary Square, arguing that the hotel's 119 suites could be rented as 238 rooms without the parking the zoning ordinance required. Fraser's assistant project manager said the council and planning board had already settled the question; Wallace, who owned an adjacent Franklin Street building, filed to meet the 30-day appeal deadline. Place: Chapel Hill · Also named: James C. Wallace, Jim Wallace · Also mentions: Franklin StreetSearch the index · The Daily Tar Heel, October 31, 1985, p. 1
  11. Jim Wallace wins a second term as mayor of Chapel Hill Former mayor Jim Wallace (1975-1979) beat council member Beverly Kawalec by 455 votes, 48 percent to 41 percent, with Wes Hare at 8 percent. Wallace said the race had become a quasi-referendum on the Rosemary Square hotel, shops and parking project, which he opposed and Kawalec supported; about a third of the town's registered voters went to the polls. Place: Chapel Hill · Also named: Jim Wallace, Beverly Kawalec, Wes HareSearch the index · The Daily Tar Heel, November 6, 1985, p. 1
  12. Town Council restricts traffic in the alleys beside the Rosemary Square site The council passed a resolution restricting traffic on the alleys connecting Franklin Street with the planned Rosemary Square hotel and shopping site and agreed that the Fraser-Morrow Co., the town's partner, would handle trash collection during construction; David Pasquini voted no. Place: Rosemary Square site, Chapel Hill · Also named: David Pasquini · Also mentions: Franklin StreetSearch the index · The Daily Tar Heel, November 14, 1985, p. 1
Show all 34 dated events
  1. Chapel Hill Town Council refuses a new hearing on Rosemary Square The Town Council voted 5-4 against a new public hearing on Rosemary Square, the $19 million hotel, shop and parking deck project at Rosemary and Henderson streets it had approved a year earlier, and authorized Town Manager David Taylor to negotiate the developer's proposed changes. Mayor James Wallace, who owned property next to the site and had opposed the project, voted for a hearing with Art Werner, Julie Andresen and David Pasquini. Place: Rosemary and Henderson streets, Chapel Hill · Also named: James Wallace, Art Werner, Julie Andresen, David Pasquini, David TaylorSearch the index · The Daily Tar Heel, January 16, 1986, p. 2
  2. Chapel Hill Town Council sends Rosemary Square revisions back to the Planning Board The Chapel Hill Town Council voted to send the Fraser Development Co.'s proposed revisions to the Rosemary Square project, a longer filing deadline, one less story and 516 parking spaces split between the developer and the town, to the Planning Board. Mayor James C. Wallace questioned whether the shared parking met the development ordinance and whether town-provided spaces would be an illegal subsidy; council members David Godschalk and Jonathan Howes doubted the referral was needed. People: Jonathan Howes Place: Municipal Building, Chapel Hill · Also named: James C. Wallace, David GodschalkSearch the index · The Daily Tar Heel, February 19, 1986, p. 3
  3. The Chapel Hill Town Council approves revised plans for Rosemary Square, 5 to 4 By a 5-4 vote the council approved the Fraser Development Company's amendments to the Rosemary Square hotel and parking project, cutting lodging units from 225 to 188, adding 16 parking spaces for 516 in all, enlarging restaurant, meeting and retail space by 15.6 percent, and setting construction to run from December 31, 1986, to June 30, 1989. Mayor James C. Wallace and council members Arthur Werner, David Pasquini and Julie Andresen voted no. Place: Municipal Building, Chapel Hill · Also named: James C. Wallace, Arthur Werner, David Pasquini, Julie AndresenSearch the index · The Daily Tar Heel, April 16, 1986, p. 3
  4. Sixteen Chapel Hill residents sue to stop Rosemary Square Sixteen residents sued the developer Fraser-Morrow Daniels Co., Mayor James Wallace and the Town Council, claiming that the $19 million Rosemary Square hotel, shop and parking project was illegal because the town's part ownership of the parking amounted to public money subsidizing a private enterprise, and that the state law authorizing it was invalid spot zoning. Town Manager David Taylor predicted the case would go to the state Supreme Court and that construction might not begin for a year. Place: Orange County Superior Court; Rosemary Street, Chapel Hill · Also named: James Wallace, David TaylorSearch the index · The Daily Tar Heel, September 24, 1986, p. 3 · Also: The Daily Tar Heel, October 1, 1986, p. 1
  5. Chapel Hill Town Council extends the Rosemary Square closing deadline because of the lawsuit At the developer's request the Town Council moved the deadline for closing the Rosemary Square deal to June 30, 1987, or six months after a final decision in the residents' lawsuit. Walter Daniels of Fraser-Morrow wrote that the pending suit made it hard for the town to issue its bonds and for the company to secure a $23 million construction loan or sell units. Place: Municipal Building, Chapel Hill · Also named: Walter DanielsSearch the index · The Daily Tar Heel, September 24, 1986, p. 3
  6. Superior Court judge upholds the Rosemary Square project against neighbors' suit Orange County Superior Court Judge Thomas Lee ruled for the town and Fraser-Morrow-Daniels Co. in the suit 16 nearby residents had filed on August 27 against Mayor James Wallace, the Town Council and the developer over the $19 million hotel, shop and parking project at Rosemary and Henderson streets. The residents had argued that the $3.5 million in town money for the project and the 1984 act of the legislature that allowed it were unconstitutional, and said they would appeal. The dismissal they later appealed was dated December 3, 1986. Place: Orange County Courthouse, Hillsborough · Also named: Thomas Lee, James Wallace · Also mentions: Rosemary and Henderson streetsSearch the index · The Daily Tar Heel, November 25, 1986, p. 1 · Also: The Daily Tar Heel, February 19, 1987, p. 3
  7. Residents appeal the dismissal of their suit against Rosemary Square Sixteen residents who had sued in August 1986 to stop the Rosemary Square hotel, retail and parking project filed their appeal of the Dec. 3, 1986 dismissal of the suit, arguing that the town's $3.5 million share of the parking garage was an unconstitutional subsidy of a private developer. Ten days earlier the state Court of Appeals had refused a request from the town and the developer, Fraser-Morrow-Daniels, to make the residents appeal sooner. Place: Rosemary and Henderson streets, Chapel HillSearch the index · The Daily Tar Heel, February 19, 1987, p. 3
  8. The N.C. Supreme Court clears the way for Rosemary Square The North Carolina Supreme Court ruled against the downtown residents who had sued Chapel Hill and the developer, finding no unconstitutional joint venture in the town's agreement to pay $3.3 million for 125 of the 516 parking spaces in the proposed $19 million Rosemary Square hotel, retail and parking complex. The court had taken the appeal directly, bypassing the Court of Appeals, at the request of the town and the developer. People: Bill Thorpe Place: Rosemary and Henderson streets, Chapel HillSearch the index · The Daily Tar Heel, September 4, 1987, p. 3
  9. Rosemary Square opponents deliver a petition of about 900 names asking for a public hearing Opponents of the Rosemary Square hotel, retail and parking complex gave the town manager's office a petition with about 900 signatures, gathered in five days largely at the Franklin Street post office, asking that the council's October 1 work session with the developers be made a public hearing. Mayor Jim Wallace, who had opposed the project from the start, and council member Nancy Preston said they favored a hearing; the developer said it would seek about $2 million if the town withdrew. Place: Municipal Building, Chapel Hill · Also named: Jim Wallace, Nancy Preston · Also mentions: Franklin Street post officeSearch the index · The Daily Tar Heel, September 24, 1987, p. 3
  10. Chapel Hill Town Council holds a second public hearing on Rosemary Square After a petition drive by opponents, the council held a public hearing on the $33 million Rosemary Square hotel, office, retail and parking complex at Rosemary and Henderson streets in place of a scheduled work session. Of 27 speakers, 17 favored the project, which the council had approved in 1985 with a town share of about $3.5 million in exchange for parking spaces. People: R. D. Smith Place: Municipal Building, Chapel Hill · Also mentions: Rosemary and Henderson streetsSearch the index · The Daily Tar Heel, October 5, 1987, p. 4
  11. Chapel Hill Town Council decides to let Rosemary Square go forward Eleven days after the second public hearing, the council informally agreed to let the developers, Fraser-Morrow-Daniels Co., carry through the $33 million Rosemary Square complex and close the deal in March 1988, with council members Julie Andresen and David Pasquini still opposed. The town planned to sell parking revenue bonds for its $3.5 million share and was to receive 125 of the garage's 516 spaces. People: Jonathan Howes Place: Rosemary and Henderson streets, Chapel Hill · Also named: Whit Morrow, Julie Andresen, David PasquiniSearch the index · The Daily Tar Heel, October 14, 1987, p. 4
  12. Chapel Hill Town Council votes 5-4 to negotiate the Rosemary Square developers' request for more time Fraser-Morrow-Daniels asked to move the closing date for the Rosemary Square hotel, shop and parking project from March 3 to Nov. 30, 1988, citing its financing and a lawsuit by opponents. On Art Werner's motion the council voted 5-4 to have the town manager, town attorney, council member Nancy Preston and the developers settle a date by Jan. 25; Mayor Jonathan Howes and David Pasquini, David Godschalk and Roosevelt Wilkerson voted no, and James Wallace said the town had extended the project three times already. People: Jonathan Howes Place: Rosemary Street, Chapel Hill · Also named: Art Werner, Walter Daniels, James Wallace, Nancy Preston, David Godschalk, David Pasquini, Roosevelt WilkersonSearch the index · The Daily Tar Heel, January 13, 1988, p. 7
  13. Chapel Hill Town Council gives Rosemary Square developers a nine-month extension By a 6-3 vote the Town Council moved the closing date for the Rosemary Square hotel, condominium, shop and parking-deck project from March 3 to November 30, 1988, so Fraser-Morrow-Daniels Co. could sell 170 of its 188 units before seeking a $30 million construction loan. It was the fourth extension since the project's 1985 approval; the council added a clause letting either side walk away if the deal had not closed by November 30. Place: Rosemary and Henderson streets, Chapel HillSearch the index · The Daily Tar Heel, January 27, 1988, p. 4
  14. Chapel Hill Town Council admits two new Rosemary Square partners and gives the project a fifth and final extension By a 5-4 vote the council moved the closing date for the Rosemary Square hotel and condominium project behind the Franklin Street post office to September 30, 1989, the developers' fifth extension since the original December 1985 deadline, and wrote in a clause ending the town's obligations if that date was missed and a promise by the developers not to sue. Julie Andresen, David Godschalk, Jonathan Howes, Nancy Preston and Roosevelt Wilkerson voted yes; Joe Herzenberg, David Pasquini, Jim Wallace and Art Werner voted no. At the same meeting the council let the Algernon Blair Group of Montgomery, Alabama, and Aircoa Equity Interest of Denver join Fraser Development's project, holding 80 percent of the equity; Mayor Howes said the original partners lacked the capital. People: Jonathan Howes Place: Rosemary and Henderson streets, Chapel Hill · Also named: Julie Andresen, David Godschalk, Nancy Preston, Roosevelt Wilkerson, Joe Herzenberg, David Pasquini, Jim Wallace, Art Werner · Also mentions: Franklin Street post officeSearch the index · The Daily Tar Heel, September 13, 1988, p. 1 · Also: The Daily Tar Heel, September 23, 1988, p. 4
  15. Units in the Chapel Hill Inn at Rosemary Square go on sale After four years of false starts, the 188 investment units of the Chapel Hill Inn, a condominium hotel planned for Rosemary Square at Rosemary and Henderson streets, went on sale in the first week of January 1989 at $144,000 to $259,000, and developer Whit Morrow of the Rosemary Group said construction of the $30 million project could begin by early summer. Under the 1985 joint development agreement the town would own 328 of the 516 spaces in the underground garage, pay $2.4 million from parking revenue bonds and keep the deed, while losing about 134 spaces from municipal lot number one during construction. Place: Municipal parking lot no. 1, Rosemary and Henderson streets, Chapel Hill · Also named: Whit Morrow · Also mentions: Rosemary and Henderson streetsSearch the index · The Daily Tar Heel, January 19, 1989, p. 1
  16. Rosemary Square developers suspend sales of Chapel Hill Inn units The Rosemary Group told the Securities and Exchange Commission it had suspended sales of the 188 condominium hotel units in its planned Chapel Hill Inn, meant to finance the Rosemary Square project, saying sales were slow and it might need a construction loan. Council member Joe Herzenberg said the 1985 town-developer parking agreement now faced an economic test, with a Sept. 30 construction deadline. Place: Rosemary Square site, downtown Chapel Hill · Also named: Joe HerzenbergSearch the index · The Daily Tar Heel, March 27, 1989, p. 5
  17. Developers abandon the Rosemary Square hotel and parking project James Adams of the Rosemary Group told the Chapel Hill Town Council that the hotel, shopping and parking complex planned since 1985 for the town lot at Rosemary and Henderson streets could not be built as a hotel or as condominiums before the September 30 deadline, ending a project whose closing date had been extended five times. Slow sales of hotel-condominium units had sunk the financing; the town was to have paid $2.5 million for 328 public parking spaces, and the council sent the matter to the town manager and town attorney while merchants pressed for a downtown parking deck. People: Jonathan Howes Place: Rosemary and Henderson streets, Chapel Hill · Also named: James AdamsSearch the index · The Daily Tar Heel, April 25, 1989, p. 1
  18. Chapel Hill picks designers for a parking garage and plaza on Rosemary Street A town subcommittee selected the architectural firm Michael Hining AIA of Chapel Hill and Wilbur Smith Associates of Raleigh to help plan a parking garage with a public plaza on top at the corner of Rosemary and Henderson streets, the town's replacement for the Rosemary Square project that collapsed in April for lack of money. Hining estimated 325 to 350 spaces, mostly hourly, and a cost that could reach $3 million. Place: Rosemary and Henderson streets, Chapel HillSearch the index · The Daily Tar Heel, October 6, 1989, p. 1
  19. Chapel Hill Town Council approves $5.2 million for a Rosemary Street parking deck and plaza The council approved spending $5.2 million on a downtown parking deck and plaza, a two-and-a-half-story, 315-space deck planned near the southwest corner of Rosemary and Henderson streets. Place: Rosemary and Henderson streets, Chapel HillSearch the index · The Daily Tar Heel, August 31, 1990, p. 3
  20. Construction of Chapel Hill's $7.3 million Rosemary Street parking deck is under way Work was under way on the town's parking deck on Rosemary Street behind the Franklin Street businesses, a $7.3 million project paid for mainly with parking revenue bonds and expected to take 15 to 18 months, with two parking levels and a top public recreation level with a small amphitheater. Town engineer George Small called it the most significant downtown project in many years; Prime South Inc. was the general contractor. Place: Rosemary Street, Chapel Hill · Also named: George Small · Also mentions: Franklin StreetSearch the index · The Daily Tar Heel, October 22, 1991, p. 3 · Also: The Daily Tar Heel, September 22, 1993, p. 3; The Daily Tar Heel, September 27, 1993, p. 3
  21. Chapel Hill's Rosemary Street parking deck opens The town's $5.5 million deck behind Franklin Street opened on September 24 with 315 spaces on two and a half levels and a landscaped rooftop plaza, built with a brick facade to fit downtown. Merchants had asked for more downtown parking since 1959; the deck was financed by revenue bonds, and a formal grand opening was set for September 28. Place: Rosemary Street parking deck, Chapel Hill · Also mentions: Franklin StreetSearch the index · The Daily Tar Heel, September 27, 1993, p. 3
  22. Chapel Hill refinances the Rosemary Street parking deck through a town corporation On May 23 the council voted unanimously to sell the parking deck at Rosemary and Henderson streets to a new Chapel Hill Facilities Corporation and buy it back in low-interest installments over 30 years, a refinancing expected to save $2 million. Place: Rosemary and Henderson streets, Chapel HillSearch the index · The Daily Tar Heel, May 26, 1994, p. 3

Reading on the places and people in this storyline

No indexed work is about this storyline itself yet. These are about the sites and people its dated events name, those named most often first, so they may discuss the storyline only in part. Follow a link to find a copy or view the material.

About Jonathan Howes · named in 7 of this story’s entries

Talk by Jonathan Howes, 1998 (Chapel Hill Historical Society cassette)

1998

Jonathan Howes, a former mayor of Chapel Hill who served in Governor Hunt's cabinet and later worked in the UNC chancellor's office on urban planning, gave this illustrated talk on the past and future of the Chapel Hill campus. Cassette, 1998.

Wider background: Growth, Land & Planning · the most widely held histories of the theme this story belongs to; they may not discuss it

American Indians in North Carolina: Geographic Interpretations

Ross, Thomas E. · 1999 · Karo Hollow Press

Thomas E. Ross's geographic study of American Indians in North Carolina. It examines Native peoples' history, cultural assimilation, and social and economic conditions across the state, with statistics. Published by Karo Hollow Press in 1999, eleven preliminary pages and 242 pages with illustrations and maps.

Chapel Hill, N.C. History of Town Lots (1790-1930s)

Dunaway, Stewart E. · 2014

Deed transcripts for the town lots of Chapel Hill and adjoining land from 1790 to the 1930s, compiled by Stewart E. Dunaway. Each transcript keeps only the working facts: grantor and grantee, price, acreage and the metes and bounds of the parcel. Self-published in 2014 as Issue 1G, 702 pages with maps and facsimiles.

Hillsborough, North Carolina : history of town lots : the complete reference guide

Dunaway, Stewart E. · 2016

Stewart E. Dunaway worked through Hillsborough, N.C., lot by lot, giving each town lot a synopsis of its history, a plat showing where it sits and transcripts of the deeds he could locate for it. The second issue runs to 720 pages with illustrations, maps and facsimiles.

Hillsborough, North Carolina History of Town Lots

Dunaway, Stewart E. · 2015 · Stewart E. Dunaway

Stewart E. Dunaway's 2015 addendum to his history of Hillsborough's town lots, adding deed records arranged by lot number and further town history, with the expansion of the 1890s covered for the first time. Self-published in North Carolina as version 1.0, 446 pages with illustrations, facsimiles and maps. Topics include deeds, court records, land titles and real property in Hillsborough.

Hillsborough District Court Civil Action Concerning Land (1778-1806)

Dunaway, Stewart E. · 2011

Stewart E. Dunaway's abstracts of civil suits over land heard in the Hillsborough District Superior Court between 1778 and 1806. The district covered Orange, Wake, Granville, Caswell, Person, Chatham and Randolph counties, and the papers concern boundaries, ownership and disputed tracts. Published through Lulu in 2011, 337 pages with illustrations, maps and facsimiles.

The Research Triangle: From Tobacco Road to Global Prominence

Rohe, William M. · 2011 · University of Pennsylvania Press

William M. Rohe's history of Research Triangle Park and the region around it, published by the University of Pennsylvania Press in 2011. Topics include regional planning and the economic and social conditions of the Research Triangle Park region, one corner of which is Chapel Hill and the university. 298 pages with illustrations and maps.

Show 6 more

North Carolina Land Grant Entry Book ... Orange County

Dunaway, Stewart E. · 2010

Stewart E. Dunaway's two-volume edition of the Orange County land entry book, the register in which settlers first claimed vacant land from the state before a grant was surveyed and issued. Volume one covers the first thousand entries, all made in 1778; volume two runs from 1779 to 1795. Each entry is reproduced from the original in the State Archives with an abstract of its contents. Self-published through Lulu in a second version dated 2010, two volumes at 28 cm with facsimiles and maps.

The school that Jack built : city and regional planning at the University of North Carolina at Chapel Hill, 1945-2012

Kaiser, Edward J. (Edward John) · 2013

Edward J. Kaiser's history of the Department of City and Regional Planning at the University of North Carolina at Chapel Hill from 1945 to 2012, published by the department in 2013. The title nods to John A. Parker, 1909 to 2001, who figures in the book. One hundred eighty-six pages with illustrations and portraits at 28 cm.

Farewell forever, old road to Durham : lessons from the history of transportation planning in the North Carolina Piedmont

Chilton, Mark · 2012 · Hand Made Books

Mark Chilton's short history of transportation planning in the North Carolina Piedmont, drawing lessons from earlier projects. Subjects include the Cape Fear Navigation Company and river navigation, and the railroads of Chapel Hill and Carrboro, including the State University Railroad Company whose spur brought trains to the two towns. Chilton was mayor of Carrboro when the book appeared. Published by Hand Made Books, Carrboro, 2012, 92 pages with illustrations, maps and portraits.

Ejectments of Orange County, N.C

Dunaway, Stewart E. · 2010 · Stewart E. Dunaway

Stewart E. Dunaway's four-volume set of ejectment cases from Orange County, reproducing the original documents and maps from the North Carolina State Archives with partial transcriptions. The volumes cover 1778 to 1814, 1817 to 1832, 1833 to 1849 and 1850 to 1902. Ejectment suits contested title and possession of land, and the cases include surveys and plats. Self-published in 2010.

Jesse Benton Letters (1780-1790)

Dunaway, Stewart E. · 2009 · lulu.com

Stewart E. Dunaway's transcription of letters exchanged between Jesse Benton and Thomas Hart from 1780 to 1790, concerning Hart's affairs at Hartford, his place at Hillsborough. The letters concern the economic and social conditions of Hillsborough in the eighteenth century and the Revolution in North Carolina. Self-published through lulu.com in 2009, 68 pages with illustrations and facsimiles, and part of the library's Wall Local History Collection.

A Generosity of Spirit: The Early History of the Research Triangle Park

Link, Albert N. · 1995 · Research Triangle Foundation of North Carolina

Albert N. Link's early history of Research Triangle Park, published in 1995 by the Research Triangle Foundation of North Carolina. Topics include research parks, research institutes and industrial research in the state, with the park's own history at the center. 149 pages with illustrations and maps.

Research sources

Sources and research tools for this storyline. Research guide: Follow an event across several accounts.

Collections and databases

Local help

More to discover

Keep Reading Local

The Friends connect people with new library materials, local writers and publishers, and resources documenting Orange County.

Two mice reading back to back against a leaf, with the hand-lettered words Friends of the Orange County Public Library
Illustration by Caldecott Medalist Matthew Cordell, gifted to the Friends 2026