Search and filters
Search and filters · 1 active
8 dated events match your filters.
Searched the full chronology of 6,171 dated events and 63 storylines, not only the highlights. Showing 1–8.Back to highlights
Entries
Reconstruction and the New South · 1866–1899
-
Alumni pledge money for an Alumni Hall at the centennial banquet
At the banquet marking a hundred years since the university opened, alumni and classes pledged gifts toward an Alumni Hall, led by Julian S. Carr with $3,000 and Thomas M. Holt with $1,000. The building, modeled on the Boston Public Library, had its cornerstone laid in 1898.
-
Work begins on the foundation of the Alumni Building
With about $7,000 of the alumni's $20,000 in pledges in hand, the trustees started the foundation and basement of a building for the president's, registrar's and bursar's offices and the physics and electrical engineering departments. Charlotte architect Frank Pierce Milburn drew the design, the first on campus planned for steam heat and electric lights.
-
Masons lay the cornerstone of the Alumni Building
Chapel Hill's University Lodge No. 408 took part in the Masonic laying of the cornerstone for the university's Alumni Building.
Early twentieth century · 1900–1944
-
The Alumni Building is finished
The Alumni Building was completed in 1901 with fourteen lecture rooms and the university's administrative offices. Venable put its cost at $36,000.
-
Fire damages the Alumni Building
A fire probably started by Joshua Gore's X-ray machine in the basement did about $1,800 in damage to the Alumni Building.
-
Student engineers wire the first campus telephone network
The electrical engineering laboratory rebuilt used telephones salvaged from a Durham textile mill to link the Alumni Building offices of the president, business manager, treasurer and registrar. Student engineers also put a radio antenna on New East to receive baseball scores.
-
Thomas C. Atwood and Arthur C. Nash form the firm Atwood and Nash, Architects and Engineers
The firm served as the university's local architects and engineers through the 1920s building campaign, working under McKim, Mead and White's William Kendall. It kept its office in the Alumni Building and another in Durham.
-
The Alumni Building's interior is renovated
The building had held the Atwood and Nash office during the 1920s campus campaign. A second renovation followed in 1973, and the two left little of that interior.
Suggest a correction to an entry →
A dated event is a fact, filed on the page of the subject it belongs to: a person, a place, a theme, or a named event or history. Pages are subjects, with their own works and sources; the Place, community, or institution filter also gathers the institutions that recur in the entries without a page of their own. The page opens on the highlights; a search or any filter looks through every dated event and storyline, and each filter’s counts say how many entries choosing it would show alongside the others. A storyline is a longer history that gathers related dated events, and each storyline’s page lists its own. Counts give dated events and storylines separately. Dates come from the sources named on the cards and from the index’s event pages; where sources disagree, the card follows the county records. Entries marked approximate or needing research say so on the card; the rest were checked against the source named on it. The correction link under the entries opens the contact form; name the entry and its date and the Friends will check the source. Suggest an event →
Compiled and maintained by the Friends of the Orange County Public Library from county records, the sources named on each card, and the index’s event pages. Last updated October 1, 2026.